Additional information
Format | Printed (50€), Digital Print (100€), PDF (80€) |
---|
€ 50.00 – € 100.00
Britain – Micro Hydropower Installations Map – 1st edition 2015
This is a new map in our Hydropower series. It is produced in association with the British Hydropower Association (BHA) and focuses on sites smaller than 100kW. Shown are all sites by location together with site name, operator and generating capacity. Symbol colour indicates the status of the site. This map covers sites that are in operation, under construction, Fully planned (consented) and sites that have been submitted to planning.
Researched and Produced by La Tene Maps.
Printed Version
Digital Print Version
PDF File Version
Format | Printed (50€), Digital Print (100€), PDF (80€) |
---|